Laserfiche WebLink
i <br /> SITE SAFETY PLAN <br /> 'I <br /> I � <br /> CLIENT: West Lane Fuel T <br /> JOB LOCATIO3302 North West Lane <br /> Stockton, California '. <br /> PLAN PREPARED BY: Tom Ballard DATE: September_, 2003 <br /> C <br /> APPROVED BY: - Gary H. Hall DATE: September_,2003 <br /> OBJECTIVES: Install three monitoring wells and collect samples. <br /> k <br /> j DATE(S) OF INVESTIGATION: Pending Workplan Approval <br /> i. <br /> SAFETY SUPERVISORS: ON-SITE: Tom Ballard, R.G. <br /> I ` h <br /> SUBCONTRACTOR: Pending <br /> ON-SITE HAZARDS: Soil and groundwater potentially contaminated with petroleum <br /> hydrocarbons, overhead and underground utilities. <br /> SITE CONTROL: Delineators and appropriate barricades to direct pedestrian and vehicle <br /> traffic away from'work area. <br /> PERSONAL PROTECTIVE EQUIPMENT: Level C/D-Gloves, steel toed boots,hard <br /> i <br /> hat, coveralls and respirator with organic <br /> cartridges on-site.. On-site personnel will be <br /> Level C certified, and have PPE on-site. <br /> i <br /> SURVEILLANCE EQUIPMENT: Photo Ionization Detector(PID), Lower <br /> Explosion Lurut (LEL)Mehr a if <br /> DECONTAMINATION PROCEDURES: Personal -Wash handsP rior to eating, <br /> drinking, smoking and before leaving site; <br /> clean clothes and respirator(if used). i <br /> Equipment- Clean equipment before <br /> leaving site�and between sampling. <br /> i <br /> i <br /> 1� <br /> E <br />