Laserfiche WebLink
I� <br /> i <br /> SITE SAFETY PLAN <br /> I <br /> CLIENT: West Lane Fuel <br /> I <br /> JOB LOCATION ": 3302 North West Lane <br /> Stockton, California 1 <br /> PLAN PREPARED BY: Tom Ballard , DATE: April 2002 <br /> APPROVED BY: Gary H. Hall DATE: April�,2002 <br /> :I I <br /> OBJECTIVES: Drill three soil borings,and collect samples. <br /> DATE(S) OF INVESTIGATION: Pending Workplan Approval <br /> 'I <br /> SAFETY SUPERVISORS: ON-SITE: Tom Ballard,%.G. <br /> SUBCONTRACTOR: Pending <br /> ON-SITE HAZARDS: Soil and groundwater potentially contaminated with petroleum <br /> hydrocarbons, overhead and under ound utilities. <br /> w <br /> SITE CONTROL: Delineators and appropriate barricades to direct pedestrian and vehicle t <br /> traffic away from work area. { <br /> I <br /> PERSONAL PROTECTIVE EQUIPMENT: Level CID-Gloves, steel toed boots,hard <br /> hat, coveralls and respirator with organic <br /> cartridges on,site.. On-site personnel will <br /> be Level C certified, and have PPE on-site. <br /> ,I <br /> SURVEILLANCE EQUIPMENT: Photo Ionization Detector(PID),Lower <br /> Explosion Limit (LEL)Meter <br /> DECONTAlVIINATION PROCEDURES: Personal -Wash hands prior to eating,' f <br /> drinking, smoking and before leaving site; <br /> clean clothes and respirator(if used). <br /> 'I <br /> Equipment 11 Clean equipment before '! <br /> leaving site and between sampling. <br /> I ' <br /> I' k <br /> i <br /> 1 <br /> F <br /> I <br /> I� f <br />