Laserfiche WebLink
YATC <br /> 1117 Lone Palm Avenue, Suite B <br /> Modesto, CA 95351 <br /> www.atcassoclates.com <br /> 209-579-2221 <br /> A S S O C I A T E S I N C . Fax 209-579-2225 <br /> Environmental,Geotechnical and Materials Engineers . <br /> Groundwater Sampling <br /> If sufficient groundwater is encountered above the terminal depth.of the borings, grab groundwater samples <br /> will.be collected from the soil borings and submitted using chain-of-custody record to a State-certified <br /> laboratory. Any groundwater samples collected will be analyzed for the constituents indicated in the <br /> preceding paragraph. <br /> Report Preparation <br /> Upon completion of the subsurface investigation activities, a summary report will be prepared for submittal <br /> to the EHD. The report will include 'a description of field activities, laboratory analytical results, boring <br /> logs, and recommendations as warranted. <br /> The work described in this workplan will be performed under the direction of a California Registered <br /> Professional Engineer or Professional Geologist. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) and Quality Control/Quality Assurance Plan on file with the EHD. <br /> Projected Schedule <br /> Once approval of this workplan has been-received, ATC will schedule drilling activities. ATC will notify <br /> the EHD at least 48 hours prior to beginning any field activities. The summary report will be submitted to <br /> EHD approximately six weeks after the completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please contact us at <br /> (209)579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> Mark Jamis <br /> Staff Geolo ' <br /> Todd Hafner,P.G. <br /> CA Professional Geologist#8090 <br /> Attachments <br /> cc: Mr. Jay McIlrath <br /> Mr. Jim Barton, CVRWQCB <br /> s:\148851workplans\wkp1n2005-add.doe 3 <br /> t <br />