Laserfiche WebLink
i <br /> Borehole Log Roy F. WESTON, Inc. I <br /> PROJECT STORE 711 PHASE II TOTAL DEPTH �I 0.00 } <br /> SITE NAME STORE 711 PHASE II LOGGER SCOTT EMERSON—PRICE/WESTON <br /> r BORING ID : SB-3 DRILLING COMPANY : SPECTRUM j <br />�I L NORTHING 0.';0000 estimated DRILLING RIG '',i : CME 75 <br /> EASTING 0.0000 estimated DATE STARTED I! : 10/13/97 <br /> ELEVATION 0.1000 estimated DATE COMPLETED 10/13/97 <br /> j <br /> � WW <br /> H H a O a H <br /> CLASSIFICATION COLOR z H U N COMMENTS l <br /> a w H '1a �a H o w ca <br /> w A � as <br /> H E <br /> PurlySP Shed sand with DRK YELL BROWN LSE iWET HNU 0.0 Drilling easier at 64 ft. <br /> 1 <br /> -61 61 <br /> I � <br /> r —— <br /> I <br /> -62 62 Intervai Not Sampied <br /> -63 --63 <br /> L -64--64 Ir <br /> II <br /> r <br /> -61 --61 100 S,Lty sand, DRK YELL BROWN FRM ISAT 4 HNU 0.0 Spa water level <br /> f u. 7 60. r#t. Hyddropunch set <br /> _ <br /> LLL -66 66 140 at 7 to 70 ft. <br /> l <br /> -67-67 f <br /> -68 -68 <br /> -69--69 I <br /> ISI <br /> II <br /> 70-70 , <br /> -71 71 <br /> 72 --72 I� <br /> 1 <br /> -73 -73 <br /> 74 74 <br /> ij <br /> - <br /> 75 ---5 <br /> -76--76 <br /> -77-77 <br /> -78--78 <br /> �i <br /> f � <br /> -79--79 <br /> 80 -80 <br /> I <br /> i t <br /> 10/20/97 GEOLIS Copyright (c) 1990, Roy F. WESTON, Inc. Page: 4 Of 4 <br />