Laserfiche WebLink
05 June 2003 <br /> AGE-NC Project No 99-0637 <br /> Page 7 of 7 <br /> • Since the extents of the MTBE Impact to soil and ground water have generally been defined, <br /> AGE believes that a Corrective Action Plan(CAP)should be Implemented to determine and <br /> test the best methods of remediation <br />' 6.0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing In this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the geologic/hydrogeologic <br />' conditions at the site for the purpose of this investigation was made from a limited number of <br /> available data points (ie soil and ground water samples) and subsurface conditions may vary away <br /> from these data points No other warranty, expressed or implied, is made as to the professional <br />' interpretations, opinions and recommendations contained in this report <br /> 1 <br /> 1 <br />' Advanced GeoEnviron mental,Inc <br /> t �_ <br />