My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PANOCHE BURN$ITE REMEDIATION <br /> 3. Remediation Project <br /> 3.1 Planned Scope of Work <br /> The proposed remediation for the Panoche Burn Site included designing an earth cover and <br /> retention dam and basin; reconsolidating the tire ash and contaminated soil to the upper <br /> regions of the canyon; constructing a compacted, monolithic low permeability soil over the <br /> contaminated material; constructing a retention structure and drainage controls; providing <br /> erosion control; and securing the site. <br /> 3.1.1 Engineering Consultant Responsibilities, CH2M HILL <br /> CH2M HILL's work included the following major tasks: <br /> > Conduct initial site survey and site investigation (sampling and analysis, topographic <br /> survey and drawings, and design report) <br /> > Prepare design (plans, supplemental specifications, and quantity estimates) <br /> > Provide construction management (direct and layout site survey and controls, serve <br /> as point-of-contact for CIWMB on construction issues and local inquiries, conduct <br /> sampling, maintain daily record of activities) <br /> > Perform additional environmental samples to determine the composition of the pyrolytic <br /> oil and possible health risk <br /> > Assist in field designs including the retention structure and geomembrane liner <br /> > Prepare site drawings <br /> > Prepare record of survey and assist the CIWMB engineer with Construction Completion <br /> Report <br /> Appendix C contains the design report for the site. <br /> 3.1.2 Remediation Contractor Responsibilities, Sukut Construction Company <br /> Sukut Construction Company's work included the following major tasks: <br /> > Prepare a remediation work plan <br /> > Provide project supervision for construction activities <br /> > Prepare a health and safety plan and perform personnel air monitoring <br /> > Furnish payment and performance bonds <br /> > Mobilize and demobilize manpower, equipment, and support materials <br /> > Provide normal and emergency site utilities and facilities <br /> > Provide dust control and temporary erosion control protection <br /> > Verify vertical and horizontal limits of burn ash <br /> > Remove and encapsulate the burn ash and contaminated soil <br /> > Construct a monolithic earthen cover <br /> > Construct a retention dam <br /> > Place 60-mil geomembrane over the toe of the fill <br /> CIWMB 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.