Laserfiche WebLink
Page 25 <br /> Attachment C BMP Consideration Checklist <br /> The following BMP's were selected for use at the construction site: <br /> BMP No BMP Category BMP Title <br /> SS-1 Temp Soil Stabilization Scheduling <br /> SS-2 Temp Soil Stabilization Preserve Existing Vegetation <br /> SS-9 Temp Flow Conveyance Earth Dikes <br /> SC-8 Temp Sediment Control Sand Bag Barrier <br /> WE-1 Wind Erosion Control Wind Erosion Control <br /> TC-1 Tracking Control Stabilized Construction Entrance <br /> NS-1 Non-Storm Water Mgmt Water Conservation Practices <br /> NS-8 Non-Storm Water Mgmt Vehicle & Equipment Cleaning <br /> NS-9 Non-Storm Water Mgmt Vehicle & Equipment Fueling <br /> NS-10 Non-Storm Water Mgmt Vehicle & Equipment Maintenance <br /> WM-1 Waste Management Material Delivery & Storage <br /> WM-4 Waste Management Spill Prevention & Control <br /> WM-5 Waste Management Solid Waste Management <br /> WM-6 Waste Management Hazardous Waste Management <br /> WM-7 Waste Management Contaminated Soil Management <br /> WM-9 Waste Management Sanitary/ Septic Waste Management <br /> WM-10 Waste Management Liquid Waste Management <br /> Prepared: April 12, 2003 <br />