Laserfiche WebLink
Page 32 <br /> Attachment J Subcontractor Notification Log <br /> Project Name: Tracy Tire Fire Remediation Site <br /> Contract Number: IWM-C2017 <br /> Subcontractor Contact Address Phone Signature <br /> Company Name Name Number <br /> In signing this log, the subcontractor acknowledges he/she has been briefed on the storm water <br /> management responsibilities that pertain to the construction site as defined by the SWPPP. <br /> Prepared: April 12, 2003 <br />