My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LFR Levine-Fricke �I <br /> Results of the well installation activities will be provided in the subsequent quarterly <br /> report. The well installation section of that quarterly report will include: <br /> • a detailed description of soil boring advancement and well installation activities <br /> • a description of sediments encountered during drilling <br /> • a lithologic and well construction log for each newly installed well <br /> Isoconcentration maps for selected COCl (e.g., VOCs, metals) will be prepared to <br /> depict the horizontal extent of affected groundwater. The monitoring parameters will <br /> be evaluated each reporting period with regard to cation/anion balance, and the results <br /> will be graphically presented using a Stiff diagram, a Piper graph, or a Schueller plot. j <br /> Geologic cross-sections will be prepared and water quality results will also be <br /> evaluated during preparation of the RI/FS for the Site. <br /> 6.0 SCHEDULE <br /> It is anticipated that the proposed groundwater monitoring well can be installed within <br /> approximately three weeks after approval is received from the regulatory agencies, <br /> pending well subcontractor availability and potential turnaround times associated with <br /> permit applications. Installation and development of the wells is expected to take <br /> approximately two weeks. Sampling of the five site wells is expected to take up to two <br /> days per quarter. <br /> Page 12 Trac <br /> y-gvly-samp-rpFwrkpin(final):JEE <br />
The URL can be used to link to this page
Your browser does not support the video tag.