Laserfiche WebLink
Suppression Project <br /> Page 2 of 2 <br /> Week Two <br /> Mobilize resources and equipment <br /> Establish Unified Command with suppression team (public or private fire) and Board contractor <br /> Hold press conference <br /> Setup perimeter air monitoring and criteria action levels <br /> Begin suppression test <br /> Perform additional environmental samples <br /> Excavate and extinguish the tire shreds/oil <br /> Week Three <br /> Continue to excavate and extinguish the tire shreds/oil. Focus on the combustion at the interface <br /> of the oil and ground surface. <br /> Prevent further spread of the fire into the pyrolytic oil reserve <br /> Perform additional environmental samples <br /> Perform temperature surveys <br /> Apply a soil sealant to temporary encapsulate the contaminated material <br /> Backfill excavations with compacted clean soils <br /> Decontaminate equipment <br /> Comparison cost - On October 28, 1999, Williams Fire and Hazard Control (the company that <br /> extinguished that Westley fire)estimated the extinguishing the fire at the Royster Site would cost <br /> over$450,000. <br />