Laserfiche WebLink
Wintering season is considered to begin December 1 and end January 31. The <br /> conservation measures addressing both these time periods are listed below. <br /> Burrowing owls are transient and may move between sites between migration, <br /> wintering, and nesting. Burrowing owls exhibit high site fidelity; a site should be <br /> assumed occupied if a least one burrowing owl has been observed occupying a <br /> burrow there within the last three years (CDFG 1995). Conservation measures for the <br /> seasonal presence (e.g. nesting, wintering, migration, etc...)of the burrowing owl is <br /> described in the following paragraphs. <br /> Conservation Measures <br /> Document review indicates that the project site is within range of the burrowing owl. <br /> Numerous occurrences (seven) of burrowing owl are reported in the CNDDB from <br /> 1991-2001 within close proximity to the project site. Based on observations, it <br /> appears that the Site could provide suitable foraging and breeding habitat for the <br /> burrowing owl. No visible sign of burrowing owl was observed during the site visit on <br /> January 31, 2003. The following four protection measures to avoid impact to the <br /> burrowing owl will be incorporated into the project because burrowing owls are <br /> transient and there is a moderate to high potential for burrowing owl to occur in the <br /> project site vicinity: <br /> ® A qualified biologist will conduct a preconstruction survey within 30 days prior to <br /> project activities to determine if burrowing owls occupy habitat on or adjacent to <br /> the project site. The survey will follow protocol as outlined in the Burrowing Owl <br /> Survey Protocol and Mitigation Guidelines (California Burrowing Owl Consortium <br /> 1993). An additional survey will be required only if there is a cessation of field <br /> work for more than 30 days during the remediation activities. <br /> ® A written report as described in the Staff Report on Burrowing Owl Mitigation <br /> (CDFG 1995)shall be submitted to the CDFG upon survey completion. <br /> ® Impact avoidance shall be the preferred method of dealing with potential project <br /> impacts. No disturbance will occur within 50 meters (approximately 160 feet) of <br /> occupied burrows during the non-breeding season of September 1 through <br /> January 31 or within 75 meters (approximately 250 feet) during the breeding <br /> season of February 1 through August 31. Avoidance measures outlined by the <br /> CDFG (1995) also require that a minimum of 6.5 acres of foraging habitat be <br /> permanently preserved contiguous to occupied burrow sites for each pair of <br /> breeding owls (with or without dependent young) or single unpaired resident bird. <br /> ® If disturbance is unavoidable, the following conservation measures shall be <br /> followed: <br /> • Occupied burrows should not be disturbed during the nesting season <br /> (February 1 through August 31) unless a qualified biologist approved by the <br /> CDFG verifies through non-invasive measures that either: 1)the birds have <br /> not begun egglaying and incubation; or 2)that juveniles from the occupied <br /> burrows are foraging independently and are capable of independent survival. <br /> • Avoidance measures outlined by the CDFG (1995)also require that a <br /> minimum of 6.5 acres of foraging habitat be permanently preserved <br /> contiguous to occupied burrow sites for each pair of breeding owls (with or <br /> without dependent young) or single unpaired resident bird. Preservation of <br /> contiguous habitat is presumed because the end result of this project is <br /> restored open space. <br /> is <br />