LFR Levine-Fricke <br /> A comprehensive RI/FS will be conducted following implementation to evaluate <br /> residual concentrations in soil and groundwater. <br /> 7.5 Site Restoration <br /> The Site will be restored by grading exceedingly steep slopes and hydro-seeding where <br /> appropriate following future investigations and/or remediation. Future remedial <br /> actions, if warranted, will be determined during assessments to be conducted following <br /> implementation of the interim remedial action. LFR contacted a Senior Planner at San <br /> Joaquin County to inform them of the upcoming project activities and to confirm their <br /> interest in site restoration(Van Buren 2003). The county was informed that this is an <br /> interim remedial activity and that any site restoration issues will be addressed after the <br /> comprehensive RI/FS is completed. The county concurred that they will review and <br /> provide input on any reclamation issues prior to the final disposition of the site. <br /> 7.6 Remedial Action Summary Report <br /> A Remedial Action Summary Report will be prepared and submitted to the regulatory <br /> agencies following completion of removal and disposal activities. The report will <br /> include the project objective and a summary of the scope of work performed, <br /> procedures implemented, quantity of material removed, and conclusions. The report <br /> will also include copies of field notes, photographs, maps of the Site, copies of waste <br /> manifests, and analytical results. <br /> Final_RAP_Tracy_9.18.03(final).doc Page 39 <br />