Laserfiche WebLink
RecoloU and environment,inc. <br /> 1. Introduction <br /> • Schedule of Sampling Activities (Section 8) <br /> • Project Organization& Responsibilities (Section 9), <br /> and <br /> • Deliverables (Section 10). <br /> The ERO and START will conduct surface and subsurface soil <br /> investigations and continue groundwater sampling. A Geoprobe® <br /> will be utilized to describe subsurface lithology and collect <br /> subsurface soil samples. If shallow groundwater is encountered, <br /> water samples will be collected. The START will also collect <br /> surface soil and burned tire residuals samples for analysis. <br /> The START will use an X-Ray Fluorescence Spectrometry <br /> XRF (XRF) for metal field screening and will submit a percentage of <br /> X-Ray Fluorescence these samples to an analytical laboratory for confirmational <br /> Spectrometry analysis. <br /> 09:C:\MyFi1es\PR0JEMTracy_Tire\QASP\QASP_0339.wpd-11/30/98 1-2 <br />