LFR Inc. <br /> collected after completion of <br /> excavation activities in this area; <br /> instead, groundwater quality was <br /> assessed. Photograph 12 depicts the <br /> excavation progress during June <br /> 2004 and demonstrates the extensive <br /> dust control measures used during <br /> excavation activities. <br /> Details of the excavation activities <br /> are provided in the report entitled, <br /> "Excavation of Pyrolytic Oil- <br /> Affected Soil Including the <br /> Construction, Use, and Destruction Photograph 10 <br /> of a Temporary Retention Pond at CIWMB staff preparing to use hydraulic lift <br /> the Tracy Tire Fire Site, San for soil sampling <br /> Joaquin County, California," <br /> prepared by LFR and dated <br /> February 15, 2006. Generally, during October 2005, approximately 4,000 cubic yards <br /> of pyrolytic oil-affected soil was excavated to approximately 3 to 5 feet below the <br /> groundwater table. To facilitate excavation, the groundwater table in the excavation <br /> area was lowered by pumping water from "dewatering pits" near the excavation area. <br /> The extracted water was conveyed to an on-site temporary retention pond. Upon <br /> completion of excavation, the excavation area and dewatering pits were backfilled. <br /> Analytical results were evaluated and additional excavation was recommended in areas <br /> where soil sampling results indicated that concentrations of metals were above <br /> background levels. Soil was excavated and additional soil samples were collected until <br /> concentrations were below the calculated background concentrations provided in <br /> Table 1. <br /> Based on evaluation of the <br /> confirmation soil sampling results <br /> and on observations at the Site, the <br /> project objectives were met, and soil <br /> containing concentrations of TRPH <br /> and/or metals above the cleanup <br /> goals was removed from the Site. <br /> 5.5 Groundwater Monitoring ` <br /> Program 00 <br /> LFR prepared a "Work Plan for Photograph 11 <br /> Groundwater Monitoring Well and <br /> Production Well Installation and Hydraulic lift extended to soil sampling <br /> Quarterly Groundwater Monitoring location on cliff face <br /> rpt-RA_summ-Nov06-fina1-09025 Page 25 <br />