GEOPROBE OPERATION <br /> CATEGORY: GEO 4.12 March 1998 <br /> L I <br /> • At the point where the lead rod does not advance and the weight of the <br /> van is placed on the rod, move the toggle switch to the full up (fast) <br /> position. Push down again on the PROBE lever and continue to push the <br /> lead rod. Allow the rear of the van to rise 6 inches off of the ground. <br /> When the weight of the van is insufficient to push the rod into the <br /> ground, push the HAMMER lever down. When the rod has advanced to <br /> the point where the derrick foot is again on the ground, release the <br /> HAMMER lever, and push the PROBE lever down until the van rises 6 <br /> inches. Repeat this process until the rod is fully driven into the ground. <br /> • Raise the hammer anvil to its full height by lifting the PROBE lever, and <br /> turn the toggle switch to the off position. Never reach into or around the <br /> hammer anvil while the toggle switch is in the on position. The helper <br /> then removes the drive cap from the lead rod and attaches the drive cap to <br /> the next rod to be used. The helper then attaches the next 3-foot rod <br /> section to the rod that has just been driven. <br /> • The toggle switch is raised to the fast position, and Steps 2 and 3 are <br /> repeated until the desired depth is reached. If the rods do not advance, do <br /> not attempt to force them. <br /> The Geoprobe 8-A is now ready for the crew to perform the required sampling activities. <br /> 5.2.4 Rod Removal <br /> After completion of the required sampling activities, the rods may be extracted from the <br /> ground by lifting the PROBE lever and raising the hammer assembly. Put the toggle switch in <br /> the off position, and lift the hammer latch to remove the anvil. Leave the hammer latch open. <br /> Once the helper has attached the pulling cap to the rod, the operator will position the toggle <br /> switch to the middle (slow) position and push the PROBE lever down and lower the hammer <br /> assembly down to the pulling cap. The operator will turn the toggle switch off and will close the <br /> hammer latch under the pulling cap. The operator will place the toggle switch in the slow <br /> position and lift the PROBE lever up to raise the hammer assembly fully up. (NOTE: The rods <br /> should never be pulled out in the fast position, as this increases the chances of breaking the <br /> hammer latch.) The operator will then push the PROBE lever down and lower the hammer <br /> assembly sufficiently to clear the pulling cap. The toggle switch is then placed in the slow <br /> position, and the PROBE lever is lifted to raise the hammer assembly fully up. The toggle switch <br /> is then placed in the off position, and the helper removes the exposed rod and attaches the pulling <br /> cap to the next rod section. The sequence is repeated until all rod sections are removed from the <br /> ground. <br /> 10 <br />