Laserfiche WebLink
LFR Inc. <br /> 5.5 Groundwater Monitoring Program ..........................................................25 <br /> 5.5.1 Monitoring Wells MW-1 through MW-5............................................26 <br /> 5.5.2 Monitoring Wells MW-6 through MW-9 and Soil Borings SB-1 and <br /> SB-2........................................................................................ <br /> 27 <br /> 5.5.3 Well Construction Summary............................................................27 <br /> 5.5.4 Summary of Sampling Results ........................................................28 <br /> 5.5.5 Destruction of Well MW-6 ............................................................29 <br /> 5.6 Excavation of Northern Slope................................................................29 <br /> 5.6.1 Slope Stability Evaluations.............................................................29 <br /> 5.6.2 Excavation Summary ...................................................................30 <br /> 5.7 Surveying ........................................................................................31 <br /> 5.8 Health and Safety Air Monitoring ...........................................................31 <br /> 5.9 Waste Transportation and Disposal..........................................................32 <br /> 5.10 Site Restoration...............................................................................34 <br /> 6.0 EXCEPTIONS TO THE RAP...................................................................34 <br /> 7.0 EVALUATION OF GROUNDWATER QUALITY.........................................36 <br /> 8.0 RISK ASSESSMENT SUMMARY.............................................................37 <br /> 9.0 SUMMARY AND RECOMMENDATIONS .................................................37 <br /> 10.0 REFERENCES.....................................................................................39 <br /> TABLES <br /> 1 Calculated Background Metals Concentrations <br /> 2 Proposed VOC, SVOC, and TRPH Cleanup Goals for Soil <br /> 3 Well Construction Summary for Wells MW-1 through MW-9 <br /> 4 Waste Material Disposal Summary <br /> Page H rpt-RA summ-Nov06-final-09025 <br />