My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 11:49:55 AM
Creation date
7/22/2020 10:29:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />GPH =Gallons Per Hour, Y = Yes, N = No, NA Not Applicable, VPH = Vacuum/Pressure/Hydrostatic, ID =Identificati <br />MONITORING SYSTEM CERTIFICATION FORM <br />(Page 5 of 6) <br />XII. LINE LEAK DETECTOR TESTING <br />❑X Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />Y <br />N <br />NA <br />This section must be completed if LLDs are installed. <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: ❑ 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />Was the testing apparatus properly calibrated? <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Were all LLDs confirmed operational within regulatory requirements? <br />El <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />El <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />For any answer of "N" above, describe in Section X111 how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING <br />EQUIPMENT TESTING <br />❑X Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID <br />Component(S) Monitored By This Sensor <br />Sensor Functionality <br />Test <br />Interstitial <br />Communication <br />Test <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />How was interstitial communication verified? <br />❑Simulated <br />Leak at Far Ends of the Interstitial Space <br />Other (Describe the method in section XV below.) <br />❑ Visual <br />❑ Gauge <br />Inspection <br />❑ <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? <br />❑ <br />Yes <br />❑ <br />No (Describe <br />the reason in <br />section XV below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will <br />be corrected. <br />XV. COMMENTS <br />on <br />
The URL can be used to link to this page
Your browser does not support the video tag.