Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of s) <br />V. TANK SECONDARY CONTAINMENT INFORMATION <br />ID = Identification <br />Manufacturer <br />Owens Corning <br />Identify Tank ID from Section III for each Manufacturer <br />AM B❑ <br />A❑ I B❑ I <br />C❑ <br />C❑ <br />D❑ <br />I D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑x Industry Code or Engineering Standard (Specify): Vacuum 10.0" H.G. <br />❑ Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached <br />Pages <br />Tank Containment Testing Training and Certifications (List applicable certifications) <br />Expiration <br />Date <br />VI. COMMENTS <br />Provide any additional comments here. <br />VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br />Manufacturer <br />A.O. Smith <br />dentify Tank ID from Section III for each Manufacturer <br />AQ B <br />A❑ I B❑ I <br />C❑ <br />C <br />D❑ <br />J D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />Z Industry Code or Engineering Standard (Specify): 5.00 PSI <br />❑ Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached <br />Pages <br />Product Piping Containment Testing Training and Certifications (List applicable certifications) <br />Expiration Date <br />Interstitial Communication Verification Method Used: <br />Villa COMMENTS <br />Provide any additional comments here. <br />