My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4733
>
2300 - Underground Storage Tank Program
>
PR0232510
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
7/22/2020 10:37:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232510
PE
2361
FACILITY_ID
FA0003924
FACILITY_NAME
HUNT & SONS INC - ARCH ROAD CARDLOCK
STREET_NUMBER
4733
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206
APN
17930008
CURRENT_STATUS
01
SITE_LOCATION
4733 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep. 5. 2018 3:52PM Donlee Pump Co <br />dI Results of Testing/Servlging <br />Software Version Installed: <br />No, 0571 P, 3 <br />�>EN U5 2018 <br />rII' Yes ❑ No' is the audible alarm operational? '-'""" "" ""'-" <br />C9 Yes ❑ No' Is the visual alarm operationally N w ` __ <br />0 Yes A!s No' Wata all sensors visually, Inspected, functionally tested, and confirmed q rational? <br />❑ Yes ev� No' Were all sensors Installed at lowest point of secondary Containment and positioned so that other equipment will not Interfere with their <br />proper o radon? <br />Yes 11 No' It alarms are relayed to a remote monitoring station, is all Communloatfons equipment (e.g. modem) operational? <br />❑ NiA <br />9 Yes ❑ No' For pressurized piping systems, does the turbine aulomalloally shut down II the piping secondary containment monitoring system <br />❑ NIA detects a leak, fails to operate, or is electrically disconneoled? If yes: which sensors Inlllate posltive shul-down? (Check all that apply) <br />& Sump/Trench Sensors; #@� Dispenser Containment Sensors. Did you confirm positive shutdown due to leaks Wd sebsor <br />(allureldisconneclion?AYes; n No. <br />❑ Yes ❑ No' For lank systems that utilize the monitoring system as ills primary tank overfill warning device (Le. no mechanical overfill prevention <br />tL WA valve Is installed), Is the overfill warning alarm visible and audibla at lite tank fill polni(s) and operating property? II so, at what percent <br />of tankc act does the alarm (rigger? Yo <br />Yes` ❑ No Was any monitoring equipment replaced? if yes, identify speollio sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Seotion E, below. <br />❑ Yes' I A No Was liquid found Inside any secondary containment systems designed as dry systems? Check all that apply) CI Product; ❑ Water. It <br />reviewed fo ensure proper seltin9s? AllaCh set <br />and When these dgllclenclas were <br />!:. Comments: <br />Monitoring $ybtem Cerllfication Page E of 4 1211?? <br />2 <br />2!21!07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.