Laserfiche WebLink
A ww opwglobol.com <br /> Materials Important OPW 7150 Overfill <br /> Valve body: Cast aluminum j In order to prevent product <br /> Prevention Valves <br /> spillage from the Underground <br /> Float: Nitrile rubber, CIOSed Cell foam fi Storage Tank(UST),properly <br /> maintained delivery equipment <br /> Valve:Aluminum 1 and a proper connection at the The CARB-certified 0 P 71 SO <br /> Seals:Vlton t <br /> ht-fll adaptortor are essential. <br /> vapor-tight or- <br /> ti9htoverfiII Prevention Valve <br /> l <br /> Delivery personnel should be is designed to prevent the overfill of <br /> Upper&lower Drop Tube:Aluminum ahs, managed and trained to inspect <br /> delivery elbows and hoses for underground storage tanks by providing <br /> Plastic parts:Acetal Fi- damaged and missing parts. a positive shut-off of product delivery. <br /> Hardware: Stainless steel They should always make certain <br /> The shut-off valve is an integral art of <br /> certain there is a positive 9 <br /> connection between the adaptor the drop tube used for gravity filling. <br /> Features *,i,r•II <br /> and elbow.If delivery equipment is not properly maintained,or the The OPW 71 SO allows easy installation <br /> ♦ Simple, Easy and Quick Installation— elbow is not securely coupled (without breaking concrete)and requires <br /> p Y 111 to the adaptor,a serious spill no special manholes. <br /> no excavation or special manholes may result when the OPW 71 SO <br /> The OPW 71 SO is a vapor-tight two- <br /> closes,causing a hazard and <br /> required. environmental contamination. stage shut-off valve. When the liquid <br /> ♦ Economical—costs a fraction of level rises to about 95% of tank capacity, <br /> expensive, complicated and difficult- NOTE:The7 is <br /> designed forr use onn ttight-fill the valve mechanism is released, <br /> to-install valves. gravity drop applications only. closing automatically with the flow.This <br /> ♦ Furnished Complete—supplied Do not use for pressure fill reduces the flow rate to approximately <br /> applications. PP Y <br /> with new upper and lower drop tubes, 5 gpm through a bypass valve. The <br /> mounting hardware and thorough ti operator may then stop the filling <br /> instructions for quick job site time. process and disconnect and drain the <br /> ♦ Completely Automatic Operation—no ♦ Retrofits Directly—for both new and delivery hose.As long as the liquid <br /> prechecks to perform, no resets and no existing tanks with 4"fill risers. exceeds the 95% level, the valve will <br /> overrides to be broken or abused. ♦ Quick Drain Feature—automatically close automatically each time delivery <br /> ♦ No Pressurization of the Tank— drains hose when head pressure is is attempted. <br /> operates directly from liquid level. relieved. If the delivery is not stopped and <br /> ♦Will Accept a Dipstick for Gauging ♦ Best Flow Rate in The Industry* the liquid rises to about 98% of tank <br /> capacity, the bypass valve closes <br /> completely. No additional liquid can flow <br /> Advantages of Overfill Prevention into the tank until the level drops below <br /> Compared to Overfill Warning Systems: a reset point. <br /> ♦ Completely Automatic Operation ♦ Speeds Delivery Operations— NOTE: The 71 SO Overfill Prevention <br /> —does not rely on the alertness or product flows unimpeded into the tank Valve can be adjusted to shutoff at any <br /> speed of response of the delivery until the hose"kick'that accompanies desired tank capacity. Please contact <br /> attendant for certainty of overfill the valve shut-off provides a clear the Authority Having Jurisdiction (AHJ) <br /> prevention. signal that the liquid has reached the and review local, state, and national <br /> ♦ Keeps the Top of UST"Dry," per shut-off level. codes to determine the regulatory <br /> EPA Requirements—eliminating ♦ Simple and Inexpensive Installation— requirements governing shut-off <br /> possible leaks at loose bung fittings in both two-point and coaxial fill capacity in your region, as well as <br /> and the need for double containment applications, no additional excavation, take into account other considerations <br /> on vent lines. manholes or vent piping are required, such as extreme tank tilt. In all cases, <br /> ♦ Does Not Rely on Pressure in the the upper tube must protrude into the <br /> UST to Stop Flow—allowing faster fill tank at least 6 112"to ensure that the <br /> times and reducing spill risk. valve can shut off flow into the tank <br /> completely before the top of the tank <br /> is wetted as per EPA requirements. <br /> Listings and Look for this label for authentic OPW EVR 71SO Instruction Sheet Order <br /> Certifications California Air Approved products. Number:H15524PA <br /> Resources Board o vwr <br /> 102 9393 Princeton-Glendale Road 4 Hamilton,Ohio USA 45011 4 Phone:(800)422-2525 * Fax:(800)421-3297 02013 OPW Fueling Components <br />