My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
7/22/2020 10:42:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. <br /> Date: <br /> Owner: <br /> Facility: <br /> OPW Overfill Model Number: <br /> Part 1 -Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons <br /> Max shut off requirement for flapper is 95% B 95% <br /> Multiply Max tank volume by 95% C Gallons a00 <br /> Use tank chart or ATG to determine height of $033 , <br /> calculated volume D Inches <br /> Measure top of fill riser threads,or face seal E Inches <br /> adapter <br /> Tank diameter(From Tank Chart) F Inches g'q <br /> Upper Tube in Tank(G)F-D=G G Inches <br /> Subtract 2"from upper tube in tank G-2"=K K Inches y 3 <br /> Calculated minimum upper tube length(n <br /> I Inches <br /> K+E=I <br /> Actual measared upper tube length(Without <br /> fill adapter) Inches <br /> Part 2-Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? a <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device function as required? NOV 1 3 2018 <br /> (Inspect the device for damage,contamination,freedom of <br /> movement,weakening due to wear and corrosion <br /> L HEALTH <br /> Device Certification PASS/FAIL DEPAR I MENT <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.