My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1800
>
2300 - Underground Storage Tank Program
>
PR0231036
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 8:00:08 AM
Creation date
7/22/2020 10:53:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231036
PE
2361
FACILITY_ID
FA0003761
FACILITY_NAME
ST JOSEPHS HOSPITAL
STREET_NUMBER
1800
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12718044
CURRENT_STATUS
01
SITE_LOCATION
1800 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Underground Storage Tank Program inspection Report <br /> Facility Name: Facility Phone: Date: <br /> ST JOSEPHS HOSPITAL 209 943-2000 October 22 2018 <br /> Facility Address: CERS ID: <br /> 1800 N CALIFORNIA ST, STOCKTON CA 95204 10181391 <br /> Inspection Contact Title: Phone: <br /> John Stagg Plant Engineer 209 461-6818 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION -Operating Permit 2361 -UST FACILITY <br /> Consent For: I Consent Given By: <br /> 27 Inspection 0 Photos 0 Samples I John Stagg, Plant Engineer <br /> Service Technician Onsite: Exp.Date: Designated Operator: Exp.Date: <br /> Zane Nimmo 06/02/2019 Zane Nimmo 02/25/2020 <br /> Service Technician Manufacturer's Training <br /> Tank Tester,03/31119; FFS, 11/16/18; VR, 09/28/19 <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during inspection <br /> File Review <br /> 101 HSC 25284 Failed to obtain a permit to operate from the EHD including but not limited to unpaid permit fees o V o R a COS <br /> 102 HSC 25284(a)(3)(A)/ No written agreement between tank owner and tank operator to monitor the tank system ❑V ❑R o COS <br /> (B) <br /> 103 HSC 25292.2,25299.317 Failure to submit and maintain complete and current financial responsibility documents n V ❑R ❑COS <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current c V o R ❑COS <br /> 105 CCR 2632(d)(1), Failed to have an approved UST monitoring pian o V ❑R ❑COS <br /> 2634(d) <br /> 106 CCR 2632(d)(2), Failed to have an approved UST response plan o V o R a COS <br /> 2634(e) <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed o V o R ❑COS <br /> 108 CCR 2637,2638(e), Failed to notify the EHD 48 hours prior to conducting testing ❑V ❑R o COS <br /> 2643(g) <br /> 109 CCR 2637(a-d),2712 Failed to test secondary containment,or failed to maintain test records for 36 months o V ❑R ❑COS <br /> 110 CCR 2637(e),2637(f) Failed to submit"Secondary Containment Testing Report Form"within 30 days after the test o V o R o COS <br /> 111 CCR 2638(,)&(b), Failed to test monitoring and leak detection equipment annually o V o R o COS <br /> 26410) <br /> 112 HSC 25293 Failure to maintain UST records to enable the UPA to determine whether the UST is in compliance ❑V ❑R ❑COS <br /> 113 CCR 2638(c),2638(d) Failure to submit"Monitoring System Certification Form"within 30 days of completion of the test o V ❑R ❑COS <br /> 114 CCR 2636(1)(3), No 0.1 gph annual line integrity test for pressurized piping,or within 30 days after repair ❑V o R o COS <br /> 2643(c)(3) <br /> 115 CCR 2715(a)(1)(B), "Designated Underground Storage Tank Operator Identification Form"not submitted within 30 days o V ❑R o COS <br /> 2715(a)(3) <br /> 116 1 CCR 2715 Designated operator,service tech or installer did not possess current ICC certification o V a R n COS <br /> 117 CCR 2663, 2712(b)(6) Failure to comply with tank lining,recordkeeping,and inspection requirements o V ❑R ❑COS <br /> 118 CCR 2715(a)(1)(A), Failure to submit the"Underground Storage Tank Statement of Understanding and Compliance Form" ❑V c R o COS <br /> 2715(a)(2) <br /> 119 HSC 25299(a)(8), Documents were falsified or misrepresented a V ❑R n COS <br /> 25299(b)(7) <br /> 120 CCR 2635(d) Failed to submit UST Certification of Installation/Modification o V a R o COS <br /> 121 CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report ❑V ❑R o COS <br /> FA0003761 PR0231036 SC001 10122/2018 <br /> EHD 23-01 Rev.09/22/i 6 Page 1 of 4 Underground Storage Tank Program OIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.