Laserfiche WebLink
I <br /> Purge Log Form <br /> Project Name!- N 4wless �� Project Number 9�' I Site Location <br /> ell No S _._ Date 0 s 1 v 6/C)q Field Tech 4 r <br /> P-1 <br /> Depth 0, Depth to water B 16 Water Column Length <br /> ' Casing Diameter y Casing Factor 6 b Volume Calculation 15— o <br /> Total Purge Volume 5'f Casing volumes Produced 3 y Pump Type LA&& ° <br /> ' PH Meter I—qy 44 L Calibrated Q6 N Cond Metery Calibrated ovor N <br /> Temp Meter 8LOIL- Turbidity Meter AA Calibrated Y or N <br /> ' <br /> [Casing Factor 2"= 17 3"=38 4"=66 5"=l 02 6"=1 5 8"=2 6 (In Gallons per linear foot)] <br /> � g <br /> Time = =Prod Rate f=--Gallons(total) DTW Ph - - Ec Tem (°C) Turbidity = Comments <br /> ]ass 3.6 6 If 13yH ?3 ,1 AIA <br /> 1104 3s 1 31 00- 6,YT- ;abs 613.5 <br /> Y 39 a�- b y7 asq 73, G <br /> 71 /a61 9- s b714 <br /> Storage or Disposal Method Ss R:tj 44,u..- Total Drums Onsite r <br /> ' Percent Recharge Prior to Sampling /002, Sample Collection Method <br /> Sample Labeled k/T nn w - S Sample Time I ySS— Laboratory <br /> ' <br /> Analysis No of Containers <br /> ' Duplicate Tnp Blank Rinsate Blank <br /> ' Comments <br /> 1 <br /> I <br />