My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 11:21:46 AM
Creation date
7/22/2020 11:10:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO #7147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [j NO <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> REMOVE EXISTING USTS DROP TUBES AND VENT BALL FLOAT CAGES AND INSTALL <br /> NEW OPW-61SO OVERFILL PROTECTION VALVES IN ALL USTS. <br /> INSTALL NEW PLLD'S IN ALL TURBINES, REMOVE EXISTING 205 TURBINE <br /> SUMP SENSORS WITH NEW VEEDOR ROOT 208 TANK TURBINE SUMP SENSORS. <br /> REMOVE EXISTING VEEDOR ROOT 407 ANNULAR TANK SPACE SENSORS WITH <br /> NEW VEEDOR-ROOT 409 ANNULAR TANK SENSORS IN ALL UST'S. <br /> PERFORM COLD START. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> OPW-61 SO OVERFILL VALVES <br /> VEEDOR-ROOT PLLD <br /> VEEDOR-ROOT 208 SENSOR <br /> VEEDOR-ROOT 409 SENSOR <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.