Laserfiche WebLink
1 Purge Lo Form <br /> Log � <br /> tProject Name ��u]Wjer r�`t` Project Number 95..- /76 Site Location <br /> *C'' <br /> No 6 Date d a 11 `�9 Field Tech�_f <br /> Total Depth Depth to water 3 9. 3 l Water Column Length <br /> Casing Diameter Casing Factor 6� Volume Calculation <br /> al <br /> Total Purge Volume �7 6 Casing volumes Produced 3.%IJ Pump Type ? a' <br /> PH Meter Dt4- Calibrated �or N Cond Meter kAv- Calibrated (Oor N <br /> Temp Meter 2�hdA' Turbidity Meter M Calibrated Y or N <br /> ' [Casing Factor 2"= 17 3"=38 4"=66 5"=1 02 6"=1 5 8"=2 6 (In Gallons per Iinear foot)] <br /> Time= =-Prod Rate t--Gallons(total) DTW Ph Ec Tem (°C) Turbidity Comments - - <br /> ' �9� b s 3� 31 9� ia �2 3o_4 AA s;U,,A <br /> b s O 6 ZA.C.- <br /> flptr <br /> � 0 g,F I 1oiI.- s t <br /> I �3� G6 u o )b 95 119 l-c � <br /> IT <br />� 1 <br /> Storage or Disposal Method Total Drums Onsite S <br /> Percent Recharge Prior to Sampling �4• Sample Collection Method __. daj, <br /> Sample Labeled /'�A I►i W ' Sample Time J j3 S Laboratory a• <br /> I <br /> Analysis_ �T�-.i- /_�N_L' _ No of Containers 2 <br /> ' Duplicate Trip Blank Rinsate Blank <br /> i <br /> Comments �'' <br />