My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012175
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:17:07 PM
Creation date
7/22/2020 11:23:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012175
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The groundwater monitoring wells will be developed after construction The <br /> groundwater monitoring wells will be purged and sampled for TPH, BTEX, 1,2- <br /> dichloroethane (DCA) and 1,2-dichloropropane.A total of 8 water samples would be <br /> collected and analyzed from the site The estimated costs to complete this phase of <br /> work are summarized in Table 3-1. <br /> .� TABLE 3-I. COST ESTIMATE TO CONDUCT ADDITIONAL <br /> GROUNDWATER INVESTIGATION <br /> TASK ESTIMATED COST <br /> Drilling, Completion and Development of 4 $15,000 <br /> Groundwater monitoring wells. <br /> Well Survey $1,500 <br /> Groundwater Well Purging, Sampling and $2,000 <br /> Analysis (8 samples for TPH/BTEX/Solvents <br /> @ 250 00 ea.) including labor <br /> Disposal of Contaminated Soil Cuttings, $2,500 <br /> Development and Pump Test Water ` <br /> Problem Assessment Report $3,000 <br /> Permits, Health & Safety Plan and Equipment, $1,500 <br /> field gear, transducers, pumps, transportation, <br /> per diem, etc <br /> Project Management 10% of total plus $2,550 <br /> miscellaneous <br /> ESTIMATED TOTAL $28,050 <br /> 7 <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.