Laserfiche WebLink
The groundwater monitoring wells will be developed after construction The <br /> groundwater monitoring wells will be purged and sampled for TPH, BTEX, 1,2- <br /> dichloroethane (DCA) and 1,2-dichloropropane.A total of 8 water samples would be <br /> collected and analyzed from the site The estimated costs to complete this phase of <br /> work are summarized in Table 3-1. <br /> .� TABLE 3-I. COST ESTIMATE TO CONDUCT ADDITIONAL <br /> GROUNDWATER INVESTIGATION <br /> TASK ESTIMATED COST <br /> Drilling, Completion and Development of 4 $15,000 <br /> Groundwater monitoring wells. <br /> Well Survey $1,500 <br /> Groundwater Well Purging, Sampling and $2,000 <br /> Analysis (8 samples for TPH/BTEX/Solvents <br /> @ 250 00 ea.) including labor <br /> Disposal of Contaminated Soil Cuttings, $2,500 <br /> Development and Pump Test Water ` <br /> Problem Assessment Report $3,000 <br /> Permits, Health & Safety Plan and Equipment, $1,500 <br /> field gear, transducers, pumps, transportation, <br /> per diem, etc <br /> Project Management 10% of total plus $2,550 <br /> miscellaneous <br /> ESTIMATED TOTAL $28,050 <br /> 7 <br /> E <br />