My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012175
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
ARCHIVED REPORTS_XR0012175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 12:17:07 PM
Creation date
7/22/2020 11:23:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012175
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3-2. COST ESTIMATE FOR EXCAVATION AND DISPOSAL OF <br /> CONTAMINATED SOIL AND GROUNDWATER <br /> TASK ESTMIATED COST <br /> Task 3.2.1 $10,000 <br /> Transportation, manifesting,handling and <br /> disposal of contaminated soil at$50/cubic <br /> yard for 200 cubic yards <br /> $4,750 <br /> Transportation, manifesting,handling and <br /> disposal at$250/55 gallon drum for 19 drums <br /> of contaminated water. <br /> Soil analysis (4 samples at$200 ea for TPH $800 <br /> and BTEX) <br /> Groundwater analysis (4 samples at$200 ea. $800 <br /> for TVH and BTEX) <br /> Task 3.2.2 <br /> Backfilling 52 cubic yards at$40/cubic yard $2,080 <br /> Task 3.2.3 <br /> Excavation, transportation, manifesting and $31,500 <br /> handling, and disposal of contaminated soil at <br /> $75/cubic yard for 420 cubic yards <br /> Backfilling 420 cubic yards at$40/cubic yard $16,800 <br /> Problem Assessment Report $1,500 <br /> Project Management (10% of total costs) $6,823 <br /> ESTIlVIATED TOTAL $75,053 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.