Laserfiche WebLink
Kennedy/Jenks Consultants <br /> SAll personnel will have a thorough understanding of the Emergency Response Plan before <br /> starting work It will be rehearsed regularly and reviewed periodically to keep it current <br /> with new or changing site conditions or information <br /> In the event of personal injury, first-aid personnel must decide if the victim's injuries are <br /> potentially the type that would be aggravated by movement If there is any doubt, or the <br /> victim is unconscious and cannot respond, no attempt should be made to move the victim <br /> to the decontamination area Only offsite paramedics may move such victims. If the <br /> paramedics approve, the victim's protective equipment will be cut off in the <br /> decontamination Reduction Zone If the decision is made not to remove the victim's <br /> protective clothing, he or she will be wrapped in a tarp or similar object to protect the <br /> ambulance and crew during transportation If the victim is contaminated with materials <br /> that threaten to cause additional injury or immediate health hazards, the personal <br /> protective equipment shall be carefully removed and the victim washed appropriately <br /> Routine and emergency communication will be provided by the site telephone. <br /> Sionatures e j� <br /> Site Safety Officer Date zZ Q12L 9z <br /> Regional Safety Supervisor Date 2a twf v <br /> • Project Manager (!!�I Date a Zd C7- 7 -x- <br /> Industrial <br /> Industrial Services Manager Date <br /> S1 matMBSAlcn 1 1 910557 00 <br />