Laserfiche WebLink
IPurge Log Form <br /> Project Name: Project Number: / Site Location: -1c"A_ <br /> No: • 0 r <br /> Date. ��K �► Field Tech:_ T <br /> ' Total Depth: 5 1 Depth to water: C1 S_ 4''i Water Column Length: 9. 0 6 <br /> Casino Diameter: o'�- Casing Factor:` Volume Calculation: /. S <br /> Total Purge Volume: Casing volumes Produced: -T,:r <br /> Pump Type: Ef' 3'� <br /> 'PH Meter: UiOK� CaIibratedoor N Gond. Meter:JA Icgw Calibrated0or N <br /> Temp Meter: Turbidity Meter: AA Calibrated: Y or N <br /> '[Casing Factor: 2"=.17 3"=.38 4"=.66 5"=1.02 6"=1.5 8"=2.6 (In Gallons per linear foot)) <br /> Time Prod. Rate Gallons(totaI) DTW Ph Ec Tem (°C) Turbidity Comments <br /> 0736 - ,%, 45.�� .acs 1VS-1 as AA iwA. t&.,- <br /> 08`10 �9.� �.o$ 14 J? �a.3244, <br /> as�yl S — -7- os fs" J.a.z y <br /> 0� 3 �.a `-lrsCa� <br /> --T <br /> Itorage or Dis osal Method:p Total Drums Onsite: �L9 <br /> ercent Recharge Prior to Sampling: / V u �~ Sample Collection Method: d of <br /> I <br /> Sample Labeled: k/? w -J y Sample Time:_L_9 5`3- Laboratory: antE+. <br /> Inalysis: CL A+ I-TANe, p�G J, z b cd V ar 6v S: 4' No. of Containers: Lt <br /> Iuplicate: Trip Blank: Rinsate Blank: <br /> Comments: <br /> I 1 <br /> 1 <br />