Laserfiche WebLink
Purge Log Form <br /> 1 <br /> Project Name: Projcrt Number: Site Location: <br /> oilNo: o Date. 1 /� pi•1Field Tech: f <br /> l' Depth: Depth to water: fly b�p Water Column Length: <br /> Cain;Diameter:_ Casing Factor: <br /> --.L— Volume Calculation-- <br /> Total <br /> alculation-Total Purge Volume: I S-� + <br /> _ Casing volumes produczd: 3 -7 Pump T3Fe: <br /> PH Meter o k'f CaIPn.ated:&or N Cond.Meter: /�� <br /> �'d _� Calibr-aked6or N <br /> 'Temp Meter. 03 -iva ! <br /> urbidity Meter: /1A Calibrated:Y or N <br /> Casing Factor. 2"=.17 3"=.33 4"=.66 5"=I.02 6"=I.5 $"-2.6 (In Gallons per linear foot)J <br /> — <br /> p <br /> AA <br /> 70 <br /> sf I ,s.o lys�b 1 L.�� <br /> tarrge or Disposal Method: r Total Drums Onsite: -� <br /> eat Recharge Prior to Sampling. /J u Q <br /> Sample p CpIIection Method: <br /> Ie Labeled: w J 0 Sample Time: 1 Laboratory: ^_ <br /> `;-6v No.of Containers: tl <br /> icnle: Trip BIank: Rin-sate Blank: <br />