Laserfiche WebLink
Purge LoL7 Form <br /> Project Name: Proje~•t Number: jrb Site Location: SC-Litj- <br /> lI No: P, Date:,1)b- 1dH Field Tech:-.A <br /> ota!Depth: 0,'4 Depth to Fater: `!S � Water Column Length: 3s- i3- <br />' Casino Diameter. CasinaFactor: Volume Calcvlado117 <br /> 1 Total Purge Volume: a-T Casing volumes Produced: 3 _� Pump T}pe: <br /> Fi3 Meer: C2lin.dted:0 or N Cone.Meter: Ula�it Calibratedoor N <br /> temp'&feter- TuTbidity Meter. 1A Calibrated:Y or N <br />�Casin-Factor. 2"=.17 3"=.33 4"=.66 5"=1.02 6"=1.5 8"=2.6 (In Gallons per Iinearfaot)1 <br /> --- <br /> �3n� � 45nt- ! ;o-�o !�� ao.6 I A I G-, 0.4, <br /> a1-w I f w xx - <br /> � �I wtb.Ll <br /> I a�� <br /> :Draw or Disposal Method: S�" Total Drums Qnsit::.. - - - <br /> tat Recharge Prior to sampling:.- 0 0 Sample Cplle--tion Me:hod:—At'. <br /> to Labeled:_- ,mom ' 16a Sample TimeLaboratory:- 9 &,-- <br /> No.of Containers: <br /> �cste: Trip BIank:__ _ _ Ri=te Bla.rsk: <br /> lents: <br />