Laserfiche WebLink
Purge Log Form <br /> Project Name: ! Project Number: 11b <br /> Site Location: � t,r <br /> Well No: 13,6 Date: d J-] )--I lob <br /> Field Tech:—A-f <br /> Total Depth: o d Depth to water: Y 0 Water Column Length: 3 (c <br /> Casing Diameter: Casing Factor:--.,.1'4 ^ Volume Calculation �- 2- <br /> Total Purge Volume: S' - Casing volumes Produced: W. °« pip Tye: <br /> PH Meter: O.A4w Calibrated:cc',Por N <br /> Cond. Meter: QA k;—%o Calibrated:Y or N <br /> Temp Meter: 0044,' Turbidity Meter:_ l A <br /> Calibrated:Y or N <br /> [Casing Factor: 2"=.17 3"=.38 4"=.66 5"=1.02 6"=1.5 8"-2.6 (In Gallons per linear foot)] <br /> Tirme =Prod=RateCralldi�s total D _- — — - - <br /> - Tw— — —�Ec <br /> /1A wow•. e�•� <br /> -- b <br /> U� <br /> 4$3.1 l �..o <br /> f6 <br /> 6 6Y4 _s <br /> u3-J- y3� <br /> Storage or Disposal Method: S Total Drums Onsite: <br /> Percent Recharge Prior to Sampling: 101 Sample Collection Method: AA"-� .:L. <br /> Sample Labele W /3 Sample Time: 1030 Laboratory: <br /> Analysis: 64 V ' U .L pt o con e3,61) No.of Containers: LI <br /> Duplicate: Trip BIank: Rinsate BIank: <br /> Comments: <br /> 0 <br />