Laserfiche WebLink
ARCADIS Ms. Lori Duncan <br /> Janurary 10, 2012 <br /> disposal.ARCADIS will coordinate disposal with an appropriately licensed <br /> subcontractor. <br /> Reporting and Schedule <br /> Upon receipt of EHD approval for the work plan and procurement of necessary <br /> permits,ARCADIS will schedule the destruction of the 18 wells associated with the <br /> site. Once the field activities are complete,ARCADIS will prepare a short letter report <br /> summarizing the completed well destruction activities.ARCADIS anticipates the <br /> letter report will be submitted to the EHD a maximum of 30 days after field activities <br /> are complete. <br /> If you have any questions please contact Sherrie Lang by telephone at 916.985.2079. <br /> ext.16 or by email at Sherrie.Lang@arcadis-us.com: <br /> .3 <br /> Sincerely, <br /> ARCADIS U.S., Inc. <br /> Sherrie Lang Lita D. Freeman, P.G., R.E.A. II <br /> Associate Project Manager Principal Geologist " <br /> M California Professional Geologist(7368) j <br /> Enclosures; <br /> Table 1 Well Construction Details <br /> Table 2 Historical Gauging and Groundwater Analytical Data i <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Attachment 1 Regulatory Correspondence <br /> Copies: <br /> Mr. James Barton, California Central Valley Regional Water Quality Control Board - <br /> Electronic Copy uploaded to Geotracker <br /> Page: <br /> GvipmWWKVWP UA546 a Oer affik5kW.&PI.IftiD b.1-%CA45469 um10 BP Wd Ce bwuw wmk Plan foci 414 <br />