My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 9:40:30 AM
Creation date
7/22/2020 1:29:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS Ms. Lori Duncan <br /> Janurary 10, 2012 <br /> disposal.ARCADIS will coordinate disposal with an appropriately licensed <br /> subcontractor. <br /> Reporting and Schedule <br /> Upon receipt of EHD approval for the work plan and procurement of necessary <br /> permits,ARCADIS will schedule the destruction of the 18 wells associated with the <br /> site. Once the field activities are complete,ARCADIS will prepare a short letter report <br /> summarizing the completed well destruction activities.ARCADIS anticipates the <br /> letter report will be submitted to the EHD a maximum of 30 days after field activities <br /> are complete. <br /> If you have any questions please contact Sherrie Lang by telephone at 916.985.2079. <br /> ext.16 or by email at Sherrie.Lang@arcadis-us.com: <br /> .3 <br /> Sincerely, <br /> ARCADIS U.S., Inc. <br /> Sherrie Lang Lita D. Freeman, P.G., R.E.A. II <br /> Associate Project Manager Principal Geologist " <br /> M California Professional Geologist(7368) j <br /> Enclosures; <br /> Table 1 Well Construction Details <br /> Table 2 Historical Gauging and Groundwater Analytical Data i <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Attachment 1 Regulatory Correspondence <br /> Copies: <br /> Mr. James Barton, California Central Valley Regional Water Quality Control Board - <br /> Electronic Copy uploaded to Geotracker <br /> Page: <br /> GvipmWWKVWP UA546 a Oer affik5kW.&PI.IftiD b.1-%CA45469 um10 BP Wd Ce bwuw wmk Plan foci 414 <br />
The URL can be used to link to this page
Your browser does not support the video tag.