Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) <br /> Type of Action El Installation Inspection ❑ Repair Inspection Z 36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181059 10/4/2018 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Quik stop market# 138 <br /> Business Site Address City ZIP Code <br /> 1153 Lincoln Blvd. Tracy 95376 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> Rey Hernandez (916) 373-1166 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 617238 8712763 5/8/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) <br /> Phase 1 EVR- CERT#0154742 RECEIV <br /> Ill. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMAT19NT 1 1 2018 <br /> Inspection Method ❑x Manufacturer Guidelines(Specify): <br /> Used: OPW Install & Maintenance Guidelines <br /> ❑ Industry Code or Engineering Standard (Specify): ENVIRON <br /> MARTMENIT <br /> ❑ Engineered Method (Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID: (By tank number,stored product,etc.) Gasoline - 87 Gasoline - 89 Gasoline - 91 <br /> What is the tank inside diameter?(Inches) 89 3/4" 89 3/4" 89 3/4" <br /> Is the fill piping secondarily contained? I]Yes ❑No R1 Yes ❑ No [E Yes ❑No ❑Yes ❑No <br /> Is the vent piping secondarily contained? 0 Yes ❑No El Yes ❑ No E Yes ❑No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturer(s) oPw oPw opw <br /> What is the overfill prevention equipment response ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activateda <br /> (Check all that apply.) Restricts Flow ❑x Restricts Flow Z Restricts Flow ElRestricts Flow <br /> ❑A/V Alarm ❑AA/Alarm ❑A/V Alarm ❑AA/Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes Z No ❑Yes [E No ❑Yes R No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) 80 3/8" 80 3/8" 80 1/4" <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 95% 95% 95% <br /> Is the overfill prevention in proper operating condition ❑x Yes ❑x Yes ❑x Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify in V) ❑No(Specify in V.) ❑No(Specify in V) ❑ No(Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ZPass ElFail ZPass ❑­Fa`ij Z Pass ❑ Fail ❑Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fail'must be explained in this section. Any additional comments may also be provided here. <br /> On site for overfill inspection test. <br /> Tested site with passing results <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accogftnodates,additional&ies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=International Code Council,AIV=Audible and Visual <br />