My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:58:54 PM
Creation date
7/22/2020 1:55:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C (continued) <br /> 71 SO Overfill Valve in Tank Complete Shut Off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> L <br /> Distance from the 71 SO inlet tube flange to the cast — e°�---- — <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D)= <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. <br /> (W)_ (D) <br /> (U)= Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension �t <br /> (OPW 6111 &61 TP models add 0.6") <br /> (B)— (W)Valve <br /> Length, <br /> bottom <br /> From the tank calibration chart provided by tank manu- of cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volume. (B) <br /> (Y)= To Tank <br /> 1. To determine complete shut-off percentage: M <br /> Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) Length, 100% <br /> (X)=(B)—(D)+ 1.5"= top of Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= <br /> (Y)tank capacity in gallons= - -- <br /> Complete SO%=(X)capacity/(Y)capacity x100= <br /> Note: The overfill valve must be installed per AM re- <br /> quirements and all applicable local,state,and national <br /> codes. If the overfill valve is set above the allowable <br /> shut-off percentage the overfill valve must be removed <br /> and replaced. <br /> Note: This Appendix only applies to valves installed per Appendix C. See Appendix B for the standard valve <br /> installation tank shut off level worksheet. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.