Laserfiche WebLink
Mr Nuel Henderson, SJCEHD April 7,2006 <br /> Well Installation Report <br /> ARCO Facility No 5469 <br /> Stockton,California <br /> Page 8 <br /> If you have any questions or comments concerning this report, please contact Jay Johnson at <br /> (530) 676-6000 <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL, INC <br /> SA <br /> J <br /> Scott G Bittinger, P G Xa Jo on, P G <br /> Project Geologist Project anager <br /> Attachments Table 1 Drilling and Well Construction Summary <br /> Table 2 Soil Analytical Results <br /> Table 3 Groundwater Analytical Results <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Site Vicinity Map <br /> Appendix A Field Practices and Procedures <br /> Appendix B Boring Logs, Well Details, DWR Well Completion Forms, <br /> and Drilling Permit <br /> Appendix C Field Data Sheets <br /> Appendix D Surveyor's Map <br /> Appendix E Certified Analytical Reports and Chain-of-Custody <br /> Documentation <br /> cc Mr Don Pratt, Atlantic Richfield Company <br /> Mr Vern Elarth, URS Corporation Americas <br /> i <br /> K 43p-Arco for URS\5469\Reports\ARC05469-wellreport2OO6 doe sTKA TU5 <br />