Laserfiche WebLink
Table 1 • . <br /> Monitoring Plan <br /> Arco Service Station No. 5469 <br /> 130 South Wilson Way <br /> Stockton, California <br /> I <br /> Parameter Sampling Fre uenc Sam le Location Analytical Method I <br /> Field Parameters <br /> 1 pH Weekly MW-1 through MW-10 Field Measurement <br /> 2 Specific Conductivity Weekly MW-I through MW-10 Field Measurement <br /> 3 Dissolved Oxygen Weekly MW-I through MW-10 Field Measurement <br /> Analyical Parameters <br /> 4 Chemical Oxygen Demand Monthly/Quarterly * MW-1 through MW-10 EPA Method 410.4 <br /> 5 Dissolved Oxygen Monthly/Quarterly * MW-1 through MW-10 EPA Method 360.1 <br /> 6 Total Organic Carbon Monthly/Quarterly * MW-1 through MW-10 SM9215B/EPA Method 300 <br /> 7 Ferrous Iron Monthly/Quarterly * MW-1 through MW-10 Hach Method 8146 <br /> 8 TPHG Monthly/Quarterly * MW-I through MW-10 EPA Method 8015 <br /> 9 BTEX Monthly/Quarterly * MW-1 through MW-10 EPA Method 8260B <br /> 10 MTBE Monthly/Quarterly * MW-1 through MW-10 EPA Method 8260B <br /> I I TBA Monthly/Quarterly * MW-I through MW-10 EPA Method 8260B <br /> 12 Plate Count&Nutrients (P, S,N) Quarterly MW-1 through MW-10 EPA Method 8260B <br /> * Monthly during first quarter 2003 and quarterly thereafter <br /> STt;ATUS <br /> Arco 5469 Sampling Plan 1 of i <br />