My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011985
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
ARCHIVED REPORTS_XR0011985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:49:36 PM
Creation date
7/22/2020 2:31:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011985
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.ti <br /> • Date _ A2ril 26, 2002 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No: 5469 Address: 130 South Wilson Way, Stockton, California <br /> ARCO Environmental Engineer: Paul Su le <br /> Consulting Co./Contact Person: Delta Environmental Consultants, Inc. l Jay R. Johnson <br /> Consultant Project No: D000-336-3 <br /> Primary Agency/Regulatory ID No: Rebecca Setliff, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (First 2'002): <br /> 1. Groundwater samples were collected from monitoring wells MW-1 through MW-10 and submitted for <br /> laboratory analysis. <br /> 2. Delta compiled and evaluated groundwater monitoring data. <br /> 3. Delta submitted Work Plan for Additional Site Assessment and Interim Remediation/Feasibility Testing <br /> on March 4, 2002. <br /> 4. Delta retained Woodward Drilling Company of Rio Vista, California to drill and install five ozone <br /> injection wells (IW-1 through IW-5) on March 25 and 26, 2002. <br /> WORK PROPOSED FOR NEXT QUARTER(Second 2002): <br /> 1. Quarterly groundwater monitoring and sampling will continue at the site. The next sampling event is <br /> tentatively scheduled for May 2002. Groundwater samples will be collected from monitoring wells <br /> MW-1 through MW-10 and analyzed for total petroleum hydrocarbons as gasoline (TPHG), benzene, <br /> toluene, ethylbenzene, and total xylenes (BTEX) using USEPA Method 8015/8020 DHS LUFT, and for <br /> tertiary butyl alcohol (TBA), methyl tertiary butyl ether (MTBE), di-isopropyl ether (DIPE), ethyl tertiary <br /> butyl ether (ETBE), tertiary amyl methyl ether (TAME), 1,2-Dichloroethane (1,2-DCA), and ethylene <br /> dibromide (EDB) using USEPA Method 8260. <br /> 2. An access agreement will be forwarded to the property owner east of the ARCO facility. <br /> Current Phase of Project: Monitoring <br /> Frequency of Groundwater Sampling: All Monitoring Wells= Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly — <br /> Sampling Date: February 21, 2002 <br /> Is Free Product(FP) Present on Site: No ^_ <br /> FP Recovered This Quarter: NIA <br /> Cumulative FP Recovered to Date: NIA <br /> Approximate Depth to Groundwater: 39.80 to 40.65 feet bgs <br /> Groundwater Flow Direction: Variable,generally towards the east-northeast with <br /> variations in flow direction to the north,west,and <br /> south-southeast <br /> Groundwater Gradient: 0.0026 (north)to 0.0064(south-southeast)ft/ft <br /> P:\ARCO\5469\Quarterly\2002\ALreo-5469-1 Q02.doe Delta <br />
The URL can be used to link to this page
Your browser does not support the video tag.