Laserfiche WebLink
GROUNDWATER MONITORING FIELD DATA SHEET <br /> Project No.: Sample Tech: Well D: <br /> SitLe Name: R, y� Site Location: S 7,GK�o DATE: <br /> WELL GAUGING INFORMATIOINFORMATIONDate Gauged Depth of Well Depth to Water Calculated purge Actual Purge <br /> (f` (ft) volume (gal) Volume {gal) <br /> Casing Diameter: 2" 4" 4.5" 6"- Other <br /> Floating Product: Yes No Color Thickness (ft) <br /> Quantity of Free Product Skimmed/removed: <br /> Sample Date: I- ,5 - Ou Sample Time• <br /> Depth to Water at Sample Time: 3 g. 2 ) <br /> Sample Method: Pump_ Bailer_ Disposable Bailer- Z_ Other <br /> PURGE WATER MONITORING <br /> FDatePuraed.- Start time: End Time: <br /> hod: <br /> Time Cum. Temp Conduct- PH <br /> Purge Color Turbidity <br /> (°C) ivity <br /> Vol. al <br /> tele- T=3 <br /> i <br /> Well Bax Integrity seals baits. lid skirt, lock, etc <br /> d <br /> Comments= <br /> CAwordlforms\Gw Sample Data Sheet.doc <br /> Rcvised 9/19199 <br />