Laserfiche WebLink
BUILDING <br /> �MW-7 R'MW-8 <br /> <50 15,000 <br /> ^'TM 4 <0.50 3,100 <br /> Q 76 131,000 <br /> AC PAVING 1D <br /> 3,100 50 <br /> 133,0001 <0.50 <br /> Mw s• 1.0 <br /> Mw-7 <br /> 150 <br /> <0.50 <br /> Mw-1 10.50 <br /> <050 <br /> 6.6 Mw�� 1100 <br /> 37,000 <br /> \ MW-5 <br /> \ ARCO FACILITY <br /> 0� NO.5489 <br /> EXISTING \\ <0 50 <br /> \ UST COMPLEX <br /> v' <br /> <5p AC PAVING <br /> c0.50 <br /> 1.6 <br /> MW-20 <br /> MW3e c50 <br /> <0.50 <br /> 10.50 <br /> PUMP <br /> O� ISLANDS <br /> AC PAVING <br /> O <br /> DR Ay <br /> LEGEND: <br /> Q5 MW-1 MONITORING WELL LOCATION <br /> <50 GASOLINE RANGE ORGANICS CONCENTRATION IN MICROGRAMS PER UTERµgIL <br /> 10-50 BENZENE CONCENTRATION IN Ijg1L <br /> 16.50 MTBE CONCENTRATION 1N ugA- <br /> SAMPLES COLLECTED ON 3D404 <br /> GRO ANALYZED USING EPA NIETHOD W15 <br /> $ BENZENE ANALYZED USING FPA METHOD 8021E <br /> MITBE ANALYZED USING EPA METHOO 82BOB <br /> WELL SCREENED IN A DEEPER PORTION OFTHE WATER BEARING ZONE <br /> g •'REPORTED RESULT FOR GRO IS DUE TO A DISCRETE PEAK AT CS AND IS REIECTED, 0 40 FT <br /> A j <br /> s <br /> SCALE <br /> s <br /> ARCO FACILITY NO.5469 FIGURE <br /> 130 WILSON WAY <br /> STOCKTON,CALIFORNIA 4 <br /> GROUNDWATER ANALYTICAL SUMMARY PROJECT NO. <br /> 1st QUARTER 2004 U 5469-01- <br /> .......... .�_ <br />