Laserfiche WebLink
• LIMITATIONS <br /> This report was prepared in general accordance with accepted standards of care that existed at the time <br /> this work was performed No other warranty, expressed or implied is made Conclusions and <br /> recommendations are based on field observations and data obtained from this work and previous <br /> investigations it should be recognized that definition and evaluation of geologic conditions is a difficult <br /> and inexact art Judgments leading to conclusions and recommendations are generally made with an <br /> incomplete knowledge of the subsurface conditions present More extensive studies may be performed to <br /> reduce uncertainties This report is solely for the use and information of our client unless otherwise noted <br /> ATTACHMENTS <br /> • Table 1 Groundwater Elevation and Analytical Summary <br /> o Table 2 Groundwater Analytical Results for Oxygenates and Additional Compounds <br /> • Table 3 Monitoring Plan Summary <br /> Table 4 Physical Parameter Summary <br /> o Table 5 Analytical Parameter Summary <br /> o Figure 1 Site Location Map <br /> o Figure 2 Site Plan <br /> o Figure 3 Groundwater Elevation Contour Map(Fourth Quarter 2003) <br /> • Figure 4 Groundwater Analytical Summary (Fourth Quarter 2003) <br /> o Figure 5 DO Variation With Time at MW-1, MW-2, MW-5, MW-7, and MW-9 <br /> • Figure 6 TPHG, Benzene, MTBE Variation With Time at MW-4 <br /> • Figure 7 TPHG, Benzene, MTBE Variation With Time at MW-5 <br /> o Figure 8 TPHG, Benzene, MTBE Variation With Time at MW-6 <br /> o Figure 9 TPHG, Benzene, MTBE Variation With Time at MW-7 <br /> U Figure 10 TPHG, Benzene, MTBE Variation With Time at MW-8 <br /> a Appendix A Field Data Sheets <br /> o Appendix B Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports with Cham-of-Custody Documentation and EDF <br /> Verification <br /> • <br /> P\Bp-Arco for URS\5469\Quarteriy\2003\Areo_5469_4Q03 doe 5TKA T-U9 <br />