My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:53:30 PM
Creation date
7/22/2020 2:50:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
FACILITY_NAME
Colonial Energy CE 40135 (DBA Power Mart)
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method By: o Manufacturer • Industry Standard o Professional Engr O Other(see below) <br /> Test Method Uses: Pressure IVacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp#1/2 Disp#314 Disp#516 Disp#718 <br /> UDC manufacturer_ _ Total Containment Total Containment Total Containment Total Containment <br /> UDC material FRP FRP FRP FRP <br /> UDC depth (inches) - 28" 28" 28" 28" <br /> Height from UDC bottom to highest 10" 10" 10" 10" <br /> piping penetration <br /> Height from UDC bottom to lowest 4" 4" 4" 4" <br /> electrical penetration <br /> Condition of UDC prior to testing Dry _ Dry _ Dry Dry <br /> Portion of UDC tested __ Entire Entire Entire _ Entire <br /> Type of shut-down present Sensor _ Sensor ___ Sensor Sensor <br /> Was sensor removed for testing? Yes _ Yes _ Yes _ _ Yes <br /> Was sensor properly replaced after testing? Yes Yes Yes Yes <br /> Depth of water level from UDC bottom (in.) 12 12 12 _ 12 <br /> Wait time for water level to stabilize (hrmin) :10 :10 :10 :10 <br /> Test start time 2:17 PM 2:17 PM _ _ __ 2:17 PM 2:00 PM <br /> Initial Probe Reading 4.4534 5.0496 __ 5.3812 2.2905 <br /> Test end time 2:32 PM 2:32 PM 2:32 PM _ 2:15 PM <br /> Final Probe Reading 4.4534 5.0498 5.3817 2.2912 <br /> Test duration(hrmin) 0:15 0:15 0:15 S <br /> Change in water level (t 0.0000 inches) 0.0000 0.0002 0.0005 _0.0007 <br /> Pass/Fail threshold (±0.0020 Inches/i Hr.) 0.0020 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> 0 2016 Wzimn Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.