Laserfiche WebLink
2018-11-20 13:12 Sunwest Chevron 2758 >> 2094683433 P 12/15 <br /> 5/25/2018 150850 <br /> Sunwest Chevron Sunwest Chevron <br /> 2758 W. Kettleman Lane 2758 W. Kettleman Lane <br /> Lodi, CA 95242 Lodi,CA 95242 RECEN <br /> D ,)v 2 0 Zola <br /> NVIR®NMIENTAI <br /> E <br /> HEALTH f'#�PAF1TMlE"'� <br /> 172006/171610 5/25/2018 1.5%fee for MC &Visa Payments <br /> 1 Materials 1�'1 Petro 2 QIP Variable Speed 905.00 905.00 <br /> 1 Materials 4 HP.Turbine site provided 0;00 . 0.00 <br /> 4 Materials 400-30 Filters 12.00 48.00 <br /> Materials45' 10;`t7V'ire 45.00 45.00 <br /> 2 Materials Tan Wire Nuts 0.75 1.50 <br /> 1 Materials 0ole 3 Amp Square b Bottom Breaker 95.00 95.00 <br /> L/T/M LabortfraveUMileagc 1010.00 1,010.00 <br /> 4-5-18 Che . <br /> eked Mas VFC showing L4 on Mag VFC ,lucked, <br /> rotor.r Replaced the t4rtiij1e and was hack up and now ok. <br /> 4-16-18,Installed 3 pole 30 amp breaker to nun 4 HP turbine.Ran <br /> 10,gauge wire from 3 phase panel to Mag VFC. Set dip switches <br /> on.Mag Controller to run 4 QIP variable speed turbines. installed 4 <br /> HP.turbine and shortened stinger 5 inches to:fit turbine. Ran <br /> pump test-at 8.6 kallons per minute. Filters were:dirty and owner <br /> wants then replaced. Changed 400-30 filters in 1/2.6hd 3/4..Need <br /> to return with 16 filters to finish. <br /> $2,104.50 <br /> Please contact us for the Monthly UST Designated Operator,Designated (8,0%) $87.56 <br /> Operator Employee'Graining and yearly compliance testing. <br /> $2,192.06 <br /> All discrepancies or claims arising from invoices must be made within 7 working <br /> days of receiving this invoice. Any claim made alter 7 days will not be <br /> considered.No exceptions, <br />