My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:41:12 PM
Creation date
7/22/2020 3:22:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tw <br /> State Water Resources Control Board <br /> Division of Clean Water Programs <br /> Winston H. Hickox 2014 T Street•Sacramento,California 95814•(916)227-4411 ff <br /> Secretaryfor Mailing Address: P.O.Box 944212•Sacramento.Calit'ornia--9424 t 4-21260 1 I O Gray Davis <br /> Environmental FAX(916)227-4530•Internet Address: http://www.swrcb.ca.gov/—cwphome/ustcf Governor <br /> Protection <br /> F E D 16 2000 <br /> Marla A Nahorn/Envir. Closures, Inc. <br /> John& Maxine Ferraiolo <br /> 7574 Shoreline Dr <br /> Stockton, CA 95219 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM,NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAIM NUMBER 015094; FOR SITE ADDRESS: 2662 WILSON_ WAY N, <br /> STOCKTON <br /> Your claim has been accepted for placement on the Priority List in Priority Class "C"with a deductible <br /> of$5,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff reviews, verifies,and processes claims based on the priority and rank within <br /> a priority class. After the Board adopts the Priority List, your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid, a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup, you have not supplied necessary information <br /> or documentation, or your claim application contains a material error, the claim will be rejected. In such <br /> event,you will be issued a Notice of Intended Removal from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record keeping_ During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the <br /> invoices, (3) copies of technical documents (bids, narrative work description,reports), and(4)evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time; however, they will definitely be <br /> required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991, you must have complied with corrective action requirements of <br /> Article 11, Chapter 16,Division 3,Title 23, California Code of Regulations. Article 11 categorized the <br /> corrective action process into phases. In addition, Article 11 requires the responsible party to submit an <br /> Caliloroia En vironmenta/Protection Agency <br /> �a RecydedPeper <br />
The URL can be used to link to this page
Your browser does not support the video tag.