My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:41:12 PM
Creation date
7/22/2020 3:22:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sohn &Maxine Ferraiolo -2- January 22, 2003 j <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the GZA proposal in my pre-approval above,please be aware <br /> that you will be entering into a private contract: the State of California cannot compel you to <br /> sign any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor.and consultant services, don't hesitate to <br /> call.me. - <br /> - i <br /> Please remember that it is still necessary to submit the actual costs of the work asexplained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown.of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports; when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at (916) 341-5796. <br /> Sincerely, <br /> Mark Owens, Water Resources Control'Engineer ` <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: San County Environmental Health Department; Stockton <br /> Gregory Stahl <br /> Ground Zero Analysis, Inc. <br /> 1714 Main Street <br /> Escalon, CA 95320 j <br /> i <br /> Cahforafa Environmental Protection Agency <br /> � I <br /> Recyc%dPeper <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.