My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:41:12 PM
Creation date
7/22/2020 3:22:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John&Maxine Ferraiolo -2- November 12, 2002 <br /> In order for future costs for corrective action to be part of the expedited reimbursement <br /> process, they must be pre-approved in writing by Fund staff. <br /> All costs for corrective action must meet the requirements of Article 11, Chapter 16, <br /> Underground Storage Tank Regulations in order to,be eligible for reimbursement. <br /> • The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However, if costs <br /> exceed the above pre-approved amounts, the Fund will be unable to expedite your <br /> Reimbursement Request. f <br /> • The work products must be acceptable to the County. <br /> i <br /> F <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs ' <br /> on the new scope of work. <br /> • Although I have referred to the GZA proposal in my pre-approval above,please be aware <br /> that you will be entering into a private contract: the State of California cannot compel you to <br /> sign any specific contract. <br /> I also want to remind you that-the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. r <br /> i <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Reimbursement Request Instructions Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> _ .,,_.,;provided for,any changes.made.in:the,scope.of work;or increases in.the-:costs. -When the — -- - - <br /> invoices are submitted you must include copies of all: <br /> E <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> CaGforuia En vironmeatal Protection Agency <br /> P„a Recyc%d Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.