Laserfiche WebLink
Mr. Jeffery Wong <br /> Page 5 <br /> Protocols and Safety <br /> All field activities performed at the site will be conducted in accordance with the Quality <br /> Assurance/Quality Control Plan and Site Specific Health and Safety Plan submitted to PHS/EHD on <br /> October 13, 1999. <br /> Drill cuttings will be placed on and covered with plastic sheeting. Water generated from well purging <br /> and equipment decontamination will be contained in labeled DOT approved drums. The drums will be <br /> stored on site pending laboratory results and the development of disposal options. <br /> Permitting and Schedule <br /> Well construction permits and associated fees will be submitted under separate cover subsequent to <br /> approval of this workplan. Following receipt of the permits, fieldwork will be scheduled. <br /> Please contact Ground Zero at your earliest convenience if you have any questions or comments <br /> regarding this report. <br /> Respectfully, <br /> Grou ero Analysis C. <br /> ean Garvey, GREGORY P. <br /> St logist * STAHL_ <br /> 7T <br /> No. 5023 <br /> Gregory <br /> Re 's� S <br /> 023 <br /> eolo 'ered HY g gidro <br /> CAst 264 �lglF OF CAUF����P <br /> cc: Mr. and Mrs. John Ferraiolo <br /> Mr. Marty Hartzell, CA Regional Water Quality Control Board <br /> Ms. Marla Nahorn,Environmental Closures <br /> Harrys\reports\workplan3mws <br /> 3 <br />