My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:38:19 PM
Creation date
7/22/2020 3:32:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rTC T, <br /> Mr. Jeffrey Wong <br /> Page 4 <br /> possible the nature and extent of contamination and will contain recommendations for additional <br /> work as appropriate. <br /> Protocols and Safetv <br /> All field and laboratory activities will be conducted in accordance with the attached Quality <br /> Assurance/Quality Control Plan (Attachment A). Field work will be performed in accordance <br /> with the attached Site Safety and Health Plan (Attachment B). <br /> Cuttings generated by drilling will be placed on an impermeable surface and covered with plastic <br /> sheeting pending laboratory results. Water resulting from equipment decontamination will <br /> likewise be contained in drums pending determination of proper disposal. <br /> Permitting <br /> A soil boring permit application along with the appropriate fees will be submitted to PHS/EHD <br /> following approval of this workplan. <br /> i <br /> Schedule <br /> Following workplan approval and receipt of the boring permit, field work will be scheduled. <br /> We anticipate that field work can be completed within six weeks of workplan approval. The <br /> technical report can be submitted to PHS/EHD within .one month thereafter. <br /> If you have any questions or comments please contact the undersigned at your convenience. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. ���ED G0/ <br /> 0 <br /> GREGORY P. <br /> STAHL <br /> No. 5023 <br /> Gregory P. Stahl, RG 5023 <br /> CA Certified Hydrogeologist No. 264 �lF OF CAUFO�� <br /> Attachments: QA/QC and SS Plans <br /> cc: Mr. and Mrs. John Ferraiolo <br /> Mr. Mark List, CA Regional Water Quality Control Board <br /> Ms. Marla Nahorn, Environmental Closures <br /> hsrryAworkplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.