Laserfiche WebLink
rTC T, <br /> Mr. Jeffrey Wong <br /> Page 4 <br /> possible the nature and extent of contamination and will contain recommendations for additional <br /> work as appropriate. <br /> Protocols and Safetv <br /> All field and laboratory activities will be conducted in accordance with the attached Quality <br /> Assurance/Quality Control Plan (Attachment A). Field work will be performed in accordance <br /> with the attached Site Safety and Health Plan (Attachment B). <br /> Cuttings generated by drilling will be placed on an impermeable surface and covered with plastic <br /> sheeting pending laboratory results. Water resulting from equipment decontamination will <br /> likewise be contained in drums pending determination of proper disposal. <br /> Permitting <br /> A soil boring permit application along with the appropriate fees will be submitted to PHS/EHD <br /> following approval of this workplan. <br /> i <br /> Schedule <br /> Following workplan approval and receipt of the boring permit, field work will be scheduled. <br /> We anticipate that field work can be completed within six weeks of workplan approval. The <br /> technical report can be submitted to PHS/EHD within .one month thereafter. <br /> If you have any questions or comments please contact the undersigned at your convenience. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. ���ED G0/ <br /> 0 <br /> GREGORY P. <br /> STAHL <br /> No. 5023 <br /> Gregory P. Stahl, RG 5023 <br /> CA Certified Hydrogeologist No. 264 �lF OF CAUFO�� <br /> Attachments: QA/QC and SS Plans <br /> cc: Mr. and Mrs. John Ferraiolo <br /> Mr. Mark List, CA Regional Water Quality Control Board <br /> Ms. Marla Nahorn, Environmental Closures <br /> hsrryAworkplan <br />