My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 4:11:54 PM
Creation date
7/22/2020 3:32:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FiberClasssystems!]MW AberGimsSystem <br />adiX1'g Nut, is successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass S sterns' Total i ' has successfully completed <br />Y � Bonder Training as set fo in the NOV Fiber Glass Systems' Total <br />'htality Installation Program fvr the installation of UL listed primary A amity insmIlation Program for the installation of UL listed primary <br />I secondary containment products. r� and secondary containment products, - <br />dRed Thread UA U / 3000A 30DOLCX Cly Red'Iirnead IIA F34900E lYi <br />3MlLCX <br />Primary and Secondary Containment Systems Date primary and Secondary Containment Systems IYdtc <br />Renewal of the bonder training is recommended every three years <br />or when the bonding ptocmb,%tta been pnt•;ticod fora period of 6 months. <br />MW Fiber Glass Systems <br />.S©(mon UnWon has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />�(Rcd Thread IFA d 3000L i3000LCX i - 14 <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended .every three yeu. <br />or when (be bonding process has not been pmdiced for a period of 6nrp tR }I v <br />iMY Mber Glass Systems <br />l <br />Aiye t Marking, 1JuYmas successfully completed <br />Bonclor Training as sot forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />i' s%d "l bread ,UA [d300043000LCX � , <br />iiary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been practiced for a period of 6 months. <br />F`&er lass Systewts <br />� �tA.l i n has succeciuliy completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products,an <br />�7 Red Thread IFA i3000L d3OQOLCX <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been pracdoed for a period of 6 months. <br />_ _ _ Fiber Class Systems <br />MI Ke,has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />�andd secondary containment products. <br />U" Red Tinead ILA � 3000L 6d3000LC.X <br />Primary and Secondary ContainmentSystem Date <br />�} Renewal. ofthe bonder tnrinirig is recommended every threc years <br />or when the bonding process has not beear practiced for a pefiod of 6 nxihtbs. <br />!1 / Wall Systems <br />— <br />A �/ <br />Mm l has successfully completed <br />BonderTtaining as set foilh in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />and secondary containment products. <br />x.11%Red Thread IIA 4a 3000L R(3000LCX �� 1 <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been prackoed for a period of 6 months_ <br />�rGlass Systems <br />: Iritr1 7 jwgj/f: has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality Installation Program for the installation of UL listed primary <br />iutd secondary -containment prood�ucts. �f f <br />4Red Thread IIA 4LI 30ML 110 3000LCX <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />,or when the bonding process has not been practiced for a period of 6 months. <br />Systems - <br />has <br />leted <br />Bunder Training asset fo in the NOV Fiber Glass Sy9tems,TOW <br />Quality Installation Program for the installation of UL listed primary <br />end secondary containment products, <br />9Red Thread IIA d3000L rU 3000L(?X l <br />Primary and Secondary Containment Systems Date <br />Renewal of the bonder training is recommended every three years <br />or when the bonding process has not been practiced for a period of 6 months. <br />M� Fker Class Systems <br />has successfully completed <br />Bonder Training as set forth in the NOV Fiber Glass Systems' Total <br />Quality installation Program for the installation of UL listed primary <br />and secondary contaiiuu/mcat products. t f l <br />lei Red Thread 11A � 0001. M 3000LCX <br />14imary and Secondary Containment Systems Date <br />wal of the bonder training is recommended every three years �Renewai of the bonder tzairting is recommended every three years <br />o; +hen the bonding pmocsc has not been practiced for a period cf 6 months. ; or when the bonding process has not been practiced for a period of 6 mouths. <br />--��j <br />
The URL can be used to link to this page
Your browser does not support the video tag.