My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 4:11:54 PM
Creation date
7/22/2020 3:32:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3887 N Valentine Fresno, CA 93722 Tel: (559) 444-1730 Fax: (559) 444-1735 Email: Nickrowe(dlcservices.com <br />Attn: Elena Manzo UST Hazardous materials inspector <br />.Project: Kwik Sery-Boyett located at 420 W. Kettleman Lane Lodi, CA <br />Scope of Work <br />- Saw cut and remove concrete around diesel manway and fill spill bucket and install a new Western Fab <br />Fiberglass Top Hat for E85 vapor bucket. Remove 4" cap from riser and install new OPW E85 Vapor <br />bucket and OPW E85 direct bury fill bucket. Repour concrete <br />- Saw cut around existing 9/10 Diesel UDC, remove concrete <br />- Soil sampling 2ft under UDC. Submit results within 5 business days <br />- Install Bravo UDC for E85 with Bravo penetrations (see cut sheets). Primary and Secondary <br />inspections before concrete. <br />- Install E85 UDC sensor, and verify connectivity <br />- Convert existing Diesel UST to E85, disconnected manifold and install E85 approved vent cap. <br />- Install Veeder Root E85 annular sensor on E85 tank. <br />- Install OPW approved E85 drop tube <br />- Convert existing 100 octane gasoline UST to Diesel, disconnect vapor line and cap off in sump, <br />disconnect manifold underground and run new DW Fiberglass vent line. Prefill APCD before <br />covering. <br />- Install (4) Bravo frames on Gasoline Island only, per Bravo survey form specs. <br />- Install (5) new Gilbarco encore dispenser with Bravo deflector plates. <br />- Install new Franklin Fueling 2" APT repair fitting on Diesel vent line. <br />- Lot as asphalt being repaired outside of fuel island, performed by others. <br />- Make SB 989 Repairs around E85 & 87 Fill Sumps. Made Repair with NOV Smith Fiberglass pipe. <br />On 87 Product line, located at the 87 Fill sump. <br />If you have any question please don't hesitate to contact me. <br />Direct contact 559-892-5287 <br />Thank you, <br />Nicholas Rowe <br />LC Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.